2008-05-06

May 6, 2008 by 408swl

It has been a long time since the last post. The house has progressed significantly. The trim ran about 3 weeks late and the painters are now finishing up inside.

2008-02-28

February 29, 2008 by 408swl

The cabinets have been installed. Trim has been going for a week and the upstairs is nearing completion.

2008-02-13

February 13, 2008 by 408swl

Here are some pictures of the tile floors. I had to get them in to allow the trim and doors to sit on the finished floor. I am going to try to grout before the doors go in. That should be by the weekend.

Master Bath

Master

Master Bath

Master Closets

Master Water Closet

Upstairs Baths

Upstairs Front Bath

Upstairs Front Bath toilet

Bonus/Bed Bath

Back Bath

Back Closet

Back Shower

2008-02-11

February 11, 2008 by 408swl

More tile work today, yesterday, day before… Here are some pics of the hardwoods before they were covered. Trim is to start later this week. I will post pictures of the travertine installed as soon as I remember to take the camera.

up hall in progress

master

stairs to kitchen

kitchen to family room

Keeping room

2008-02-07

February 7, 2008 by 408swl


Hardwoods downstairs are done. I have been working on the tile upstairs on the bathroom floors and just started on the Master bath floor. Still have 3 showers upstairs to tile and the master shower.

Family room

Dining Room

Keeping Room

Kitchen

Family Room/Breakfast
Master Bedroom

Master Ceiling

Landing to downstairs

Landing to upstairs

Upstairs Hall

Craft Room Cubby

Craft Room

Bonus / Bedroom

Media Room

Front Bedroom right

Front Bedroom

2008-01-28

January 27, 2008 by 408swl

Sheetrock is done. Floors have been installed. Trim carpenter is starting next week.

2008-01-02

January 3, 2008 by 408swl

Insulation finished up today. It was tough getting it done… The sheetrockers came 3 days ago and finished in only 2 days. The finish guys started yesterday and amazingly are there right now (midnight) and will probably finish up by the weekend. I will be cleaning up this weekend. In the meantime, I have been working on the small built-ins for the baths and bonus room. We are making our final decisions on the flooring material.

2007-12-23

December 23, 2007 by 408swl

The insulation install is almost done. They worked Friday and have finished all but the master ceiling, a little more in the storage roof area and the garage. They hope to finish up tomorrow after they pick up more material. I have an inspection scheduled for Thursday the 27th. The sheetrock is on site and will go in as soon as the insulation inspection is successful.

2007-12-18

December 18, 2007 by 408swl

More insulation today. The second floor is coming along but an equipment failure stopped us short. Hopefully tomorrow will be more productive. Sheetrock is on the way on Thursday. We are doing an interior door and trim takeoff tomorrow am.

2007-12-17

December 17, 2007 by 408swl

Insulation was sprayed on the first floor and a couple of rooms on the second floor.